Open · Applications for the first fifty residents

Cities · The Land

This is the ground we build on.

About 15,491 acres on Tennessee’s Cumberland Plateau, near Pioneer, across Campbell and Scott Counties. A mining company stripped the top of it. It has grown back for about 20 years. Under it: silica sand, deep coal and producing gas wells.

Every number on this page says where it comes from. The known problems are listed too.

Rendering: an aerial view of a forested valley with a great stone hall at its centre, terraces and halls on the ridges either side, linked by paths and bridges, fog and a lake in the distance
Blue-green dawn aerial with a road threading the valley floor — the Cumberland Plateau waking up
Elk Valley tract · Campbell County, Tennessee

About these numbers.

The numbers on this page fall into four kinds. Here is which is which, before you read further.

Kind 1

On the ground today

Things you can see on a site visit or check in the seller’s records: the acreage, the producing gas wells, the I-75 frontage, the regrown forest. The current owner earns gas royalties, timber and hunting-lease income from the land.

Kind 2

Third-party reports

Estimates made by outside professionals for the seller: a 2022 valuation, engineering reports on the coal, and lab tests of the silica sand, shared with serious parties under NDA. They are estimates, not promises of what the resources will earn. We did not commission them.

Kind 3

The deal

We are negotiating to buy the land and have prepared a letter of intent. It is not under contract. The price is in the data room, not on this page, while we negotiate.

Kind 4

Our plan

Our own research on grants, the Tennessee utility district and Phase 1 costs. These are plans and estimates. No grant has been awarded and no district has been formed.

Whenever we cite a number on this site, we say which kind it is.

Where it is.

Near Pioneer, Tennessee, on the Cumberland Plateau, across Campbell and Scott Counties. Four tracts, including Elk Valley, Westbourne and the silica tract along I-75. CSX rail runs within reach of the property.

Property boundary overlay on satellite imagery: about 15,491 acres across Campbell and Scott Counties
About 1 hourKnoxville
About 3 hoursNashville
About 2½ hoursChattanooga
About 4½ hoursAtlanta
Deep forested valley with roadMountain ridge aerialRidge vista, blue mountain layers

What is on it.

Each line says where the number comes from.

AssetDetailSource
Silica sandLarge reserves; high purity after processing in a lab test. Needs a processing plant to be usableSeller’s reports, under NDA
CoalIn two valleys. Deep: the surface seams were stripped. Not under an active mining permitSeller’s reports, under NDA
Gas wellsProducing wells, paying royalties to the landownerSeller’s records, under NDA
ForestHardwood grown back for about 20 years since the miningSite visit; timber records
HighwayAbout 3 miles of I-75 frontage on the silica tractSeller’s package
RailCSX main line about 5–15 miles awaySeller’s package; broker
Water50+ inches of rain a year; creeks across the tractsRegional rainfall; seller’s package
StoneNative sandstone and field stoneSeller’s package
Mine entrance and exposed rock face, left from earlier miningActive well pad on the propertyExposed silica sand deposit, raw material for glass and solar manufacturingCSX railroad near the property

What it unlocks.

Each resource maps to something the city needs. Each one takes work before it pays.

Silica sand

→ Materials

High-purity silica is the feedstock for glass, solar panels and building materials. The tests are serious. Making it usable takes equipment and a processing plant.

Coal

→ Energy, later

The coal is real but deep; the top was stripped. It has no active mining permit. We treat it as a long-term option, not a plan for year one.

I-75 and rail

→ Movement

About 3 miles of interstate frontage, with CSX rail within reach. Heavy materials in, finished goods out.

Wells

→ Income

Producing gas wells pay royalties today. It is modest income, not enough to fund a city, but it is real.

Forest

→ Structures

Hardwood that has grown back for about 20 years. A careful harvest can supply lumber, furniture and fuel.

Water

→ Food

50+ inches of rain a year and creeks across the land. Enough to plan farms and greenhouses around.

The numbers, with their sources.

  • Total acreage
    about 15,491 acres, four tractsthe seller’s public listing
  • Resources
    silica sand, deep coal and producing gas wellsthe seller’s reports, shared under NDA
  • Grant coverage of Phase 1 infrastructure
    50–80 percent, our planning estimateour research on program rules; nothing applied for or awarded yet
  • Tennessee utility district formation
    about 30–90 days and $10,000–25,000our research; not yet formed

The public programs.

Campbell and Scott are distressed Appalachian coal counties. Federal and state programs exist to rebuild places like this. We plan to apply. Nothing has been awarded.

ARC

Appalachian Regional Commission

Infrastructure and economic development grants for distressed Appalachian communities. Covers roads, water, broadband, and public facilities.

POWER

Partnerships for Opportunity and Workforce and Economic Revitalization

Coal-community transition grants. Specifically designed for communities losing coal economy jobs. Covers workforce development, infrastructure, and economic diversification.

AMLER

Abandoned Mine Land Economic Revitalization

Federal program for reclaiming abandoned mine land for economic reuse. Converts legacy mining infrastructure into productive assets.

USDA

USDA Rural Development

Low-interest loans and grants for rural infrastructure, cooperative enterprises and community facilities.

Also: EDA (Economic Development Administration) public works grants, Tennessee FastTrack infrastructure and job training grants, and USDA Rural Business Development grants. Our planning estimate is that these could cover 50–80% of Phase 1 infrastructure. That is a plan, not a commitment from any agency. The land is not in an Opportunity Zone today; its census tracts are eligible to be nominated in the next round.

The municipal path.

Tennessee utility district law is one of the fastest and cheapest ways to form a public district. A district is formed by petition of property owners and approved by the county. Our research puts it at about 30–90 days and $10,000–25,000. The comparable path in Texas takes 18–24 months.

Once formed, a Tennessee utility district can issue tax-exempt bonds and run utilities such as water, sewer and gas. Planned communities across the country use special districts like this to pay for roads and pipes.

The utility district is the path from private land to public infrastructure. It is how about 15,491 acres can pay for its own roads and water.

The documents.

We hold the seller’s 296-file due-diligence package, shared with us under NDA. Serious investors, operators and applicants can ask to review it, as far as the seller’s terms allow. It covers:

  • Land information, surveys and legal descriptions
  • Deeds, title work and prior title opinions
  • Prior appraisals and the 2022 valuation
  • Coal engineering reports
  • Silica sand lab tests
  • Gas well locations and records
  • Timber records
  • Field stone
  • Hunting leases
  • Our letter of intent (on request)

Known problems.

This land has real friction. Here is what we know, and what we plan to do about it.

Known problem

The land was mined.

A mining company stripped the top of this land. Some areas will need an environmental assessment and possibly reclamation before anyone builds. A Phase I environmental assessment is next; we have proposals in hand. AMLER and EPA Brownfields programs exist for this work.

Known problem

The resources take setup.

The silica needs equipment and a processing plant before it earns anything. The coal is deep and has no active mining permit. We do not count on either to fund Phase 1.

Known problem

Title and the close.

Parts of the land have split surface and mineral rights that counsel must sort out before closing. The seller will not finance the sale, so the land must be paid for with raised capital.

Known problem

Roads, power and the district.

Access roads need grading and widening. The utility district must be petitioned and approved before it can issue bonds or run utilities. Each is a legal and political process with its own timeline.

We think each of these can be solved. None is solved yet. Ask us about any of them.

Landowners · Resource Contributors · Connectors

Contribute land, resources, or refer a landowner.

Do you own a major tract of land, know a landowner who wants to build something enduring, or have materials, machinery, or industrial capabilities to contribute? Tell us below.

This starts a conversation. It commits no one to anything, and it is not an offer to buy, sell or invest.

Prefer direct email? Write to mars@buildcivilization.com

The valley from above with a road, temple and terraces drawn over it in line-artSite visits

Come see it.

We arrange site visits for serious investors, operators and applicants. Walk the silica tract, the ridges, the creeks and the well pads with the founder, and see what 20 years of regrowth looks like.

Email mars@buildcivilization.com to ask for a date.

A City with a Soul
Contact

Build Civilization, Inc. is based in Lenexa, Kansas. The land is near Pioneer, Tennessee. The planned structure, being set up with counsel: a holding company owns two siblings. Build Civilization, Inc. builds the software and holds the brand. A Tennessee series LLC, one per city, holds the land in its own series, with separate series for development, operations and each zone, so each one's risk stays its own. Every number on these pages says where it comes from; the Land page explains them. Nothing on this site is an offer to sell securities. Any offer will be made only through offering documents, and only to verified accredited investors. This is an early-stage, illiquid, high-risk venture. You could lose all of your investment. Nothing here promises or projects a return.